尚岗一号隧道软弱围岩施工技术  被引量:1

Construction Technology of Soft Surrounding Rock of Shanggang No.1 Tunnel

在线阅读下载全文

作  者:李成业 LI Cheng-ye(The 4th Engineering Co.,Ltd.of China Railway 25th Bureau Group,Liuzhou 545007,Chin)

机构地区:[1]中铁二十五局集团第四工程有限公司,柳州545007

出  处:《价值工程》2018年第16期139-141,共3页Value Engineering

摘  要:隧道软弱围岩强度低、自稳能力差,开挖后隧道周边产生较大的松动圈,常因工程措施和施工方法不当引发初期支护变形侵限和隧道坍方等工程问题。尚岗一号隧道软岩地层主要有泥岩、砂岩等,有微膨胀性。软岩隧道施工中存在的主要问题是变形大、易坍塌、进度慢,软岩变形侵限、塌方处理时间长、安全隐患大。因此软岩隧道施工首先是控制变形和预防坍塌,其次是加快施工进度。The weak surrounding rock of the tunnel has low strength and poor self-stability. After the excavation, there is a large loose circle around the tunnel. Engineering problems such as initial support deformation and tunnel collapse are often caused by improper engineering measures and construction methods. The soft rock strata of Shanggang No. 1 Tunnel are mainly mudstone, sandstone and so on.The main problems in soft rock tunnel construction are large deformation, easy to collapse, slow progress, soft rock deformation, long time to deal with collapse and large hidden danger of safety.Therefore, the construction of soft rock tunnel is to control deformation and prevent collapse first, and then to accelerate the construction progress.

关 键 词:软弱围岩 变形 坍塌 预防 

分 类 号:U45[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象