检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶赪镠 程春姬[1] 马晋[1] YE Cheng-liu;CHENG Chun-ji;MA Jin(China National Aeronautical Radio Electronics Research Institute,Shanghai 200233,Chin)
出 处:《软件》2018年第5期194-198,共5页Software
摘 要:GJB5000A四级定量项目管理是通过组织的年度质量和过程绩效基线和模型,确定项目定量管理目标,预测达到目标的确定性概率,在项目执行过程中通过定期监控,对目标偏离的情况主动采取最优措施,确保项目目标的最终实现。本文详细介绍了基于GJB5000A四级的软件定量项目管理方法,及其在软件开发过程中带来的好处。Quantitative management of software process, one domain of GJB5000 A Maturity Level 4, determines the quantitative management objective according to the organization's yearly Quality and process-performance baseline and model, forecasts the certainty of the objective's achievement, and monitors the software process regularly, takes the optimized measure if it deviates from the objective to make sure the objective can be successfully implemented. This paper introduces the software Quantitative management method based on GJB5000 A maturity level 4.
关 键 词:软件定量管理 GJB5000A-2008 过程绩效基线和模型
分 类 号:TP311.5[自动化与计算机技术—计算机软件与理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33