检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李震宇[1] LI Zhenyu(State Grid Shanxi Electric Power Corporation,Taiyuan,Shanxi 030001,China)
出 处:《山西电力》2018年第3期15-17,共3页Shanxi Electric Power
摘 要:为确保重要输电通道安全运行,提升输电线路抗风险能力,国家电网公司组织开展了重要输电通道风险评估工作。在评估过程当中,山西省电力公司依托风险评估一体化平台,纵向贯通省、市、县(工区)、班组四级单位,合理进行人力调配,实时录入实时分析,简化了工作流程,着力于监督和检查,为后续输电线路通道治理奠定坚实基础。In order to ensure the safe operation of important transmission corridors and improve the anti-risk capabilities of transmission lines, the State Grid Corporation of China organized and conducted risk assessments for important transmission corridors.During the assessment process, Shanxi companies rely on an integrated risk assessment platform to vertically involve four-level units in the assessment, reasonably conducting manpower deployment and carrying out real-time analysis, which simplifies the working process and focuses much on supervision and inspection. It lays a solid foundation for the post-treatment of transmission line corridors.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.24.197