作 者:李辉 盛登强 LI Hui;SHENG Dengqiang(Tibet Development and Investment Jinqiao Hydropower Development Co.,Ltd.,Jiali 852400,Tibet,Chin)
机构地区:[1]西藏开投金桥水电开发有限公司,西藏嘉黎852400
出 处:《水力发电》2018年第8期50-52,共3页Water Power
摘 要:金桥水电站地下厂房设计最大开挖尺寸为83.8 m×20 m×35.4 m(长×宽×高),是目前西藏自治区水电工程首个地下厂房,为确保施工进度,采用立体多层平行开挖的方案,实现了"竖向多层次,平面多工序"的立体开挖,确保了地下厂房开挖施工工期。The maximum excavation size of the underground powerhouse of Jinqiao Hydropower Station is designed as 83. 8 m ×20 m × 35. 4 m( length × width × height). It is the first underground powerhouse of hydropower project in Tibet. To ensure the construction progress,a three-dimensional multi-layer parallel excavation scheme is adopted. The excavation scheme achieves a three-dimensional excavation of " multi-layer in vertical surface and multi-process in horizontal surface ", and thus the excavation construction period of underground powerhouse is ensured.
分 类 号:TV731.6[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31