金桥水电站地下厂房立体开挖施工技术探讨  被引量:3

Three-dimensional Excavation Construction Technology for the Underground Powerhouse of Jinqiao Hydropower Station

在线阅读下载全文

作  者:李辉 盛登强 LI Hui;SHENG Dengqiang(Tibet Development and Investment Jinqiao Hydropower Development Co.,Ltd.,Jiali 852400,Tibet,Chin)

机构地区:[1]西藏开投金桥水电开发有限公司,西藏嘉黎852400

出  处:《水力发电》2018年第8期50-52,共3页Water Power

摘  要:金桥水电站地下厂房设计最大开挖尺寸为83.8 m×20 m×35.4 m(长×宽×高),是目前西藏自治区水电工程首个地下厂房,为确保施工进度,采用立体多层平行开挖的方案,实现了"竖向多层次,平面多工序"的立体开挖,确保了地下厂房开挖施工工期。The maximum excavation size of the underground powerhouse of Jinqiao Hydropower Station is designed as 83. 8 m ×20 m × 35. 4 m( length × width × height). It is the first underground powerhouse of hydropower project in Tibet. To ensure the construction progress,a three-dimensional multi-layer parallel excavation scheme is adopted. The excavation scheme achieves a three-dimensional excavation of " multi-layer in vertical surface and multi-process in horizontal surface ", and thus the excavation construction period of underground powerhouse is ensured.

关 键 词:立体开挖 地下厂房 金桥水电站 

分 类 号:TV731.6[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象