ATP装置烟气余热回收与产能提高  

Flue Gas Waste Heat Recovery and Yield Promoting in ATP Plant

在线阅读下载全文

作  者:闫玉麟 王珂 蔺靑 YAN Yu-lin;WANG Ke;LIN Qing(Shale Oil Plant of Fushun Mining Group Co.,Ltd.,Liaoning Fushun 113115,China)

机构地区:[1]抚顺矿业集团有限责任公司页岩炼油厂,辽宁抚顺113115

出  处:《辽宁化工》2018年第7期642-644,共3页Liaoning Chemical Industry

摘  要:ATP装置至2013年8月投入运行以来,先后对烟气冷却器、布袋除尘器进行技术改造,使装置的运行周期由几天延长至近3个月。但是,页岩处理量始终在140 t/h,远远没有达到设计要求的230 t/h。如何突破技术壁垒,接近或达到设计要求是整个运行的核心任务。本文就处理量低的原因进行分析,并提出了增加烟气余热锅炉的方案,来解决页岩处理量低这一难题。Since the ATP device was put into operation in August 2013, technical renovation of flue gas cooler and bag house filter has been carried out successively, and the operating cycle of the device has been extended from a few days to nearly three months. However, the processing capacity of shale is always at 140 t/h, and does not reach the 230 t/h of the design requirement. Then, the core task of the whole operation is how to break through technical barriers to meet design requirements. In this paper, the causes of low processing capacity were analyzed, and a plan to apply the flue gas waste heat boiler was put forward to solve the problem of low shale processing capacity.

关 键 词:ATP装置 烟气冷却器 余热锅炉 页岩 处理量 

分 类 号:TQ171.625.4[化学工程—玻璃工业]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象