安徽黄屯硫铁矿矿坑涌水治理的帷幕注浆工艺  被引量:6

Curtain Grouting Technique for Pit Water Discharge Treatment of Huangtun Pyrite Mine in Anhui Province

在线阅读下载全文

作  者:乐应 Le Ying(Central South Exploration & Foundation Engineering Co.,Ltd)

机构地区:[1]中南勘察基础工程有限公司

出  处:《现代矿业》2018年第7期220-222,共3页Modern Mining

摘  要:安徽省庐江县黄屯硫铁矿经过前期水文地质勘察,预测矿坑涌水量达到108 000 m3/d。为确保矿山安全开采,采用帷幕注浆方法对矿坑涌水进行治理。详细分析了帷幕设计参数、施工工艺、技术要求,实践表明:工艺实施后,使得主孔水位标高由-13.55 m降至-16.92 m,堵水率达到65%以上。Through plevious hydrological investigation of Huangtun Pyrite Mine in Lujiang County in Anhui Province ,it is predicted that the pit water discharge volume is 108 000 mB/d. In order to guarantee the safety production of the mine, the curtain grouting technique is used to deal with the pit water dis- charge. The curtain design parameters, construction processes and technical requirements are analyzed in detail. The practical results show that the water level elevation of main borehole is decreased from -13.55 m to -16.92 re,the water plugging rate is higher than 65%.

关 键 词:帷幕注浆 矿坑涌水 施工工艺 技术要求 

分 类 号:TD745[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象