作 者:沈炜[1] 古勇合[1] 彭志强[1] Shen Wei;Gu Yonghe;Peng Zhiqiang(Xinsteel Iron & Steel Group Co.,Ltd.Xinyu 338001 Jiangxi,China)
出 处:《江西冶金》2018年第3期45-49,共5页Jiangxi Metallurgy
摘 要:对新钢2 500 m^3高炉炼铁和对应的烧结工序的锌平衡情况进行研究,结果表明:进入高炉的锌量为1.055 kg/t,主要由烧结矿和球团矿带入,其中烧结矿带入的锌量占总量的84%,高炉锌主要由布袋灰排出(占总排出量的89%);烧结工序中,带入的锌量为1.162 kg/t,主要来源于混匀料、内部冷返矿和除尘灰(占总量的97.47%),锌的排出由烧结矿和返矿带出(占总排出量的95.92%)。结合新钢生产实际情况,提出了在烧结、炼铁工序中减少锌带入量、加大锌排出量的建议。The zinc balance of 2 500 m^3 BF ironmaking and corresponding sintering process is studied in Xinyu Steel. Results show that the amount of zinc into the blast furnace of 1. 055 kg/t,is mainly composed of sinter and pellet among then,the sinter carries 84% of the total amount of zinc. Zinc blast furnace is mainly discharged through bag dust( accounting for 89% of the total discharge).IN 1. 162 kg/t zinc is carried in sintering process,mainly comes from blending materials,internal cold back to mine and dust( accounting for 97. 47% of the total),discharged by the sinter and recovery of zinc ore( accounting for 95. 92% of the total discharge). According to the actual production situation in Xinyu Steel,the measures to reduce the amount of zinc and increase the amount of zinc are put forward.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195