检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨壮 张其朋 黄洁 李国华 Yang Zhuang,Zhang Qipeng,Huang Jie,Li Guohua(Shanxi Jizhong Energy Group Rong Tai Mine, Lvliang 033000, China)
机构地区:[1]山西冀中能源集团荣泰矿,山西吕梁033000
出 处:《煤炭与化工》2018年第7期55-58,共4页Coal and Chemical Industry
摘 要:针对综采工作面俯斜开采防治水技术的难题,以山西冀中能源集团荣泰矿10116工作面为例,采取"防、堵、疏、排、截"防治水综合治理措施,利用物探、钻探、注浆等技术手段,降低了该工作面回采期间工作面涌水量,同时根据矿井水文地质条件,通过钻孔将工作面上覆含水层涌水导流至工作面底板奥灰水含水层,降低了工作面的排水压力,保证了工作面的安全回采,为相似水文地质条件下综采工作面俯斜开采综合防治水技术提供了借鉴。Based on the difficult problem of water prevention and control technology in inclined mining of fully mechanized mining face, Rongtai Mine 10116 working face of Shanxi Jizhong Energy Group was taken as an example, the comprehensive measure of "preventing, plugging, draining, discharging and intercepting" was adopted to prevent and control water, the geophysical prospecting and drilling was used. Grouting and other technical means greatly reduced the water discharge of the working face during the mining process. At the same time, according to the hydrogeological conditions of the mine, the overlying aquifer of the working face was diverted by drilling to the Ordovician water aquifer on the floor of the working face. The drainage pressure of working face was reduced, and the normal mining face was guaranteed. The technology provided reference for comprehensive prevention and cure water technology of fully mechanized mining face under the same hydrogeological conditions.
分 类 号:TD74[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7