检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袭铁夫 韩菲 XI Tiefu;HAN Fei(North China Municipal Engineering Design Research Institute Corporation,Tianjin 300074,Chin)
机构地区:[1]中国市政工程华北设计研究总院有限公司,天津300074
出 处:《天津科技》2018年第8期38-39,43,共3页Tianjin Science & Technology
摘 要:重庆某垃圾二次转运站工程总承包项目是重庆市重点工程,涵盖设计、采购、施工、开车及试运行等建设阶段。结合项目管理实践分析了项目沟通管理重点。项目沟通管理贯穿项目管理的全过程,应依据规范和实际需求编制详细的沟通管理计划,明确干系人、沟通内容、介入阶段、重要性、沟通频率、沟通方式及责任人,并在项目实施过程中动态调整。通过沟通管理责任化、规范化、信息化、动态化建设,不断提升项目沟通管理能力,确保项目管理目标如期实现。Taking the EPC project of refuse transfer station in Chongqing,which includes design,procurement,construction,commissioning,and trial operation as an example,the emphasis on communication management was analyzed and improvement management method was discussed as reference for next EPC projects.With the specific content of relevant departments, communication content, communication time, importance, communication frequency,communication method and responsible person,project communication management plan should be prepared according to code and management specification and actual demand.Through the construction of responsibility,standardization,information and dynamic improving communication management ability was used to achieve project management objectives.
分 类 号:TU721.1[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.215.60