检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:封志军[1] Feng Zhijun(China Railway Eryuan Engineering Group Co. , Ltd, Chengdu 610031 , Chin)
机构地区:[1]中铁二院工程集团有限责任公司,四川成都610031
出 处:《山西建筑》2018年第21期63-64,共2页Shanxi Architecture
摘 要:针对西南某高速铁路客运站深厚软基高填方工程,在现场成桩试验基础上,研究了预应力管桩在环滇池地区深厚淤泥质土中的适用性,对施工完毕后的填方过程进行了沉降监测。监测表明,沉降稳定,无病害发生,整治效果良好,为以后同类工程提供了一定的参考经验。For a southwest high speed railway station deep soft base high fill project. The adaptation of PHC pile used in the deep mucky soil around the Dianchi is researched on the base of the pile site test. After the construction,the observation of embankment deformation was performed. Results of monitoring indicated that the ground settlement was stable and there was no disease happened. In general,the ground treatment has get a good result. It offers certain reference experience for the same kind of engineering.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229