检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖根旺[1] 朱顺生[1] 王晓智[1] XIAO Genwang;ZHU Shunsheng;WANG Xiaozhi(China Railway Major Bridge Engirwering Group Co.Ltd,Wuhan 430050,Chin)
机构地区:[1]中铁大桥局集团有限公司,湖北武汉430050
出 处:《测绘科学技术学报》2018年第2期201-205,共5页Journal of Geomatics Science and Technology
摘 要:以在建的武汉四环线青山长江大桥为例,针对大型斜拉桥超高塔复杂结构高精度控制测量特点,按照绝对控制与相对控制分阶段测量的思路,系统研究了斜拉桥超高塔平面工作基准点竖向传递的主要测量方法及误差大小,最终确定"全站仪天顶测量+全站仪短距极坐标测量"为超高塔锚固件定位测量方案。工程应用表明,该方案满足施工精度要求,对其他类似工程有重要参考价值。Taking the on-going Qingshan Yangtze River Bridge as the example which is a large cable-stayed bridge with super-high pylons and complex structure requiring hi-precision controlling survey,main survey methods and error range related to the vertical transfer measurement of super-high pylon plane datum points are studied systematically in the paper,according to the principle of absolute control and relative control measurement in various stages. Finally,the proposal of total station zenith measurement and total station polar coordinate measurement for short distance is determined as the measurement plan of the anchoring parts location. The application shows that the plan can meet the requirements of construction precision and provide important reference for other similar projects.
关 键 词:斜拉桥超高塔 锚固件定位 绝对控制测量 相对控制测量 全站仪 竖向传递测量
分 类 号:P258[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.52