检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨传景[1,2] Yang Chuanjing(China Shipbuilding Ndri Engineering Co.,Ltd,Shanghai 200063,China;Shanghai Research Center of Ocean & Shipbuilding Engineering,Shanghai 200063,China)
机构地区:[1]中船第九设计研究院工程有限公司,上海200063 [2]上海海洋工程和船厂水工特种工程技术研究中心,上海200063
出 处:《山西建筑》2018年第17期87-89,共3页Shanxi Architecture
摘 要:通过静力触探监测比贯入阻力并采用探地雷达现场监测试夯后粉细砂土层结构变化,采用地下水位仪观测真空降水效果,采用三维有限元数值模拟强夯后粉细砂土层竖向位移;确定了夯击能、夯锤间距和夯击次数等施工参数,明确了降水深度、比贯入阻力和最后两夯沉降差等质量控制参数。Ground penetrating radar and static cone penetration test were used to observe the variation of soil structure after dynamic compaction.Electrical contacted water level indicator was used to monitoring the effect of dewatering. Three-dimensional finite element software was also used to simulate the vertical deformation of soil structure. Tamping energy,distance of tamping hammer and tamping times were given. Dewatering depth,specific penetration resistance and vertical deformation difference of last two times tamping were specified as quality control parameter.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15