火电机组脱硫DCS系统升级改造的策略与应用  被引量:1

Strategy and Application of Upgrading of Thermal Power Unit in Desulphurization DCS System

在线阅读下载全文

作  者:傅喻帅 Fu Yushuai(Zhuhai Power Plant of Guangdong Yuedian Group Co., Ltd., Guangdong Zhuhai 51900)

机构地区:[1]广东省粤电集团有限公司珠海发电厂,广东珠海519000

出  处:《现代工业经济和信息化》2018年第8期16-17,32,共3页Modern Industrial Economy and Informationization

摘  要:通过对珠海电厂脱硫控制系统改造方案实施过程中所遇难点及解决方案的总结汇总,提出多网段隔离分配、合理制定改造方案、分段精细化制定施工计划的应对策略。实际改造案例结果表明,该项目所采用的改造策略可保证安全合理完成脱硫控制系统改造项目并达到改造预期目的。Through summary of the problems and solutions in the process of reforming the desulfurization control system of Zhuhai power plant, this paper puts forward the countermeasures for the isolation and distribution of multiple network segments, the rational formulation of reform schemes, and the detailed formulation of the construction plan. The results of the actual reconstruction case show that the reform strategy adopted in this project can ensure the safe and reasonable completion of the desulfurization control system renovation project and achieve the desired purpose.

关 键 词:火电机组 脱硫DCS改造 控制系统物理隔离 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象