检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵治祥 Zhao Zhi-xiang(Tongxin Coal Mine, Datong Coal Mining Group Co., LTD., Shanxi Datong 03700)
机构地区:[1]大同煤矿集团有限责任公司同忻煤矿,山西大同037003
出 处:《山东煤炭科技》2018年第6期103-104,107,共3页Shandong Coal Science and Technology
摘 要:本文针对同忻煤矿10kV变电所存在的接地故障查找不方便等现状,提出了利用暂态分析,配合多CPU构架的新装置改造方案,改造后无论是实接地还是瞬时接地故障的判断准确性都有了大幅的提高,该方案能够提供更多的采样数量和精度。因此,具有一定的实践性,也可以为类似变电所提供参考。This paper is aimed at overcoming the difficult in finding the ground fault in10 kV substation in Tongxin Coal Mine, and puts forward a new device reconstruction plan with the use of transient analysis and multi-cpu framework. After the reconstruction, the judgment accuracy of both real and instantaneous ground fault is improved greatly, which can provide more sampling quantity and precision.Therefore, it has certain practicality and can provide reference for similar substation.
分 类 号:TM862[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7