检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张敏[1] 袁奇[1] 秦龙[1] ZHANG Min;YUAN Qi;QIN Long(Guizhou Transportation Planning and Design Academe Co.,Ltd.,Guiyang 550081,China)
机构地区:[1]贵州省交通规划勘察设计研究院股份有限公司,贵阳550081
出 处:《交通科技》2018年第3期21-24,共4页Transportation Science & Technology
摘 要:为解决厦蓉线贵州境毕节至生机段高速公路二堡互通在已建填方体上修建高挡墙,或者下伏填方与上覆高挡墙同时施工问题,鉴于高路肩墙支挡设计中填方体基底的承载力不足问题,根据理论分析及稳定性计算,设计出本段填方支挡所需要的较为合理的7,8,9,10m的扶壁式挡墙尺寸。将扶壁式挡墙引入贵州省内的高速公路支挡防护,应用于下伏填方体基底时上覆高挡墙的设计,从而达到在确保路基稳定性的前提下,节约投资,加快施工进度,缩短施工工期的目的。The gravity retaining walls and the pile cap retaining walls are usually designed and constructed during highway construction in Guizhou province when the basis of retaining walls is the filling base,or the lower filling base and overlying retaining walls isconstructed at the same time.According to the theoretical analysis and stability calculation,the reasonable 7,8,9,and 10 msizes of counterfort retaining walls have been designed to solve the insufficient bearing capacity problem of the filling base in high shoulder wall support designing in Erbao interchange of Bijie-Shengji highway.The counterfort retaining walls have been introduced as the highway block protection in Guizhou highway,which is applied to the protection of the high retaining wall designing when the basis is filling base.So that the purpose of saving investment,speeding up construction progress and shortening construction period have been achieved under the premise of ensuring roadbed stability.
分 类 号:U417.11[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145