地下室剪力墙柱及顶板的清水混凝土施工  被引量:2

Fair-Faced Concrete Construction of Basement Shear Wall,Column and Roof Slab

在线阅读下载全文

作  者:朱郁 ZHU Yu(Suzhou Construction Engineering Quality & Safety Supervision Station,Suzhou,Jiangsu 215002,China)

机构地区:[1]苏州建筑工程质量安全监督站,江苏苏州215002

出  处:《建筑施工》2018年第4期509-511,517,共4页Building Construction

摘  要:针对某生产车间地下室清水混凝土施工中的重、难点,从模板体系的选用、试验墙施工工艺、模板搭设工艺、混凝土浇筑工艺、细部改进及节点处理等方面,总结了地下室剪力墙柱及顶板的清水混凝土施工工艺,实施效果良好,可为类似工程提供借鉴。Combining the important and difficult construction points of fair-faced concrete in the basement of a production workshop, such construction technologies for the basement shear walls, columns and ceilings were summarized from the aspects of formwork system selection, test wall construction technique, formwork erecting technique, concrete pouring technique, details improvement and node processing, etc., which has obtained an excellent implementation effect, and can provide references for similar projects.

关 键 词:地下室结构 清水混凝土 钢框模板 施工工艺 

分 类 号:TU755[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象