AP1000核电站220kV倒送电调试过程控制  

在线阅读下载全文

作  者:邓明亮 

机构地区:[1]国核工程有限公司调试中心,上海200233

出  处:《科技创新与应用》2018年第27期64-65,共2页Technology Innovation and Application

摘  要:倒送电是核电工程建设中的里程碑节点,该里程碑节点的成功实现标志着AP1000海阳依托项目获得了稳定的厂外电源,为后续即将展开的大面积调试提供了可靠电源保障。倒送电调试项目工期紧、任务重,为保证倒送电调试活动有序、高效的开展,必须对倒送电的调试过程进行良好的控制,海阳1号机组倒送电过程控制的优秀经验也为其他机组的倒送电调试打下了良好的基础。Reverse power transmission is a milestone node in the construction of nuclear power project. The successful realizationof the milestone node indicates that the AP1000 Haiyang project has obtained a stable off-plant power supply, which provides a reli-able power guarantee for the follow-up large-scale commissioning. In order to ensure that the commissioning activities of reverse pow-er transmission are carried out in an orderly and efficient manner, the commissioning process of reverse power transmission must bewell controlled. The excellent experience of the reverse power supply process control of the Haiyang No.1 unit has also laid a goodfoundation for the commissioning of the reverse power transmission of other units.

关 键 词:AP1000 调试 倒送电 过程控制 

分 类 号:TM762.1[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象