被动式营房施工进度综合评价研究  被引量:1

Study on Comprehensive Evaluation of Passive Barracks Construction Progress

在线阅读下载全文

作  者:回月彤 白云[1] 张艳菊 HUI Yue-tong;BAI Yun;ZHANG Yan-ju(Department of Logistics Support,Logistics University of People's Armed Police Force,Tianjin 300309,China)

机构地区:[1]武警后勤学院后勤保障系,天津300309

出  处:《价值工程》2018年第30期11-13,共3页Value Engineering

基  金:武警后勤学院基础研究项目WHJ201607

摘  要:从环境的角度分析影响被动式营房施工进度的因素,建立被动式营房施工进度指标体系,以被动式营房活动持续时间为综合评价目标,确定预计工期,为被动式营房进度管理提供科学依据,提高计划管理与进度控制的科学水平,优化资源配置,提供工程建设效率。This paper analyzes the factors affecting the construction progress of passive barracks from the perspective of environment,establishes the passive barrack construction progress indicator system, takes the duration of passive barracks activity as the comprehensiveevaluation target, determines the estimated construction period, to provide scientific basis for passive barracks schedule management,improve the scientific level of plan management and schedule control, optimize resource allocation, and provide engineering constructionefficiency.

关 键 词:被动式营房 环境因素 施工进度 综合评价 

分 类 号:TU722[建筑科学—建筑技术科学]

 