检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李鹏[1] LI Peng(Shenyang Municipal Engineering Maintenance Management Office,Shenyang 110000,China)
出 处:《价值工程》2018年第30期137-139,共3页Value Engineering
摘 要:在市政给排水施工中,受到施工周期因素与成本因素的影响,短距离顶管施工方式已经不能满足要求,因此,很多市政给排水工程在施工期间已经开始选择使用长距离顶管施工技术方式,可将每次施工的长度控制在100m以上,缩短工程施工周期,提升工作质量,降低成本提高经济效益,增强企业的竞争力。因此,市政给排水施工中,需合理使用长距离顶管施工技术,在工作中总结丰富经验,为其后续发展夯实基础。In the construction of municipal water supply and drainage, due to construction cycle and cost factors, short-distance pipejacking construction methods can no longer meet the requirements. Therefore, many municipal water supply and drainage projects havebegun to choose long-distance pipe jacking construction technology during construction. The method can control the length of eachconstruction to more than 100m, shorten the construction period, improve the work quality, reduce the cost, improve the economic benefit,and enhance the competitiveness of the enterprise. Therefore, in the construction of municipal water supply and drainage, long-distance pipejacking construction technology should be used reasonably, and the rich experience should be summed up in the work to lay a solidfoundation for its subsequent development.
分 类 号:S276[农业科学—农业水土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15