检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张俸俊 ZHANG Feng-jun(Sinohydro Bureau 5 Co.,Ltd.,Chengdu 610200,China)
机构地区:[1]中国水利水电第五工程局有限公司,成都610200
出 处:《价值工程》2018年第29期183-185,共3页Value Engineering
摘 要:本文介绍了苏丹上阿特巴拉水电站ZF28-252型SF6气体绝缘封闭高压开关设备现场安装工艺及相关要求,着重介绍了现场安装准备、现场运输与就位安装调整和设备固定三方面细节和质量控制、安全等方面应注意的问题,为公司以后的作业指导书编写提供了依据和参考。This paper introduces the on-site installation process and related requirements of ZF28-252 type SF6 gas-insulated closed high-voltage switchgear of Sultan Upper Atbara Hydropower Station, focusing on the details of on-site installation preparation, on-site transportation and in-position installation adjustment and equipment fixing and the problems that should be paid attention to in terms of quality control and safety, which provides basis and reference for the compilation of the company’s future work instructions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222