紫坪铺水力发电厂发变组保护装置改造  

Transformation of Generator-transformer Unit Protection Device in Zipingpu Hydropower Plant

在线阅读下载全文

作  者:曹建高 

机构地区:[1]四川省紫坪铺开发有限责任公司,四川成都610091

出  处:《四川水力发电》2018年第4期51-53,共3页Sichuan Hydropower

摘  要:针对原发变组保护装置使用年限过长,电子元器件老化等问题,紫坪铺水力发电厂对发变组保护装置进行升级改造。经改造后,优化了保护配置,大幅提高了保护性能。同时,调试方便,动作可靠,减少了维护工作量和年维护费用,为我厂发变组设备的可靠运行提供了有利保障,也为今后设备改造提供了借鉴。For problems of long service life and aging electronic components of primary generator-transformer unit protection device,the generator-transformer unit protection device is upgraded in Zipingpu Hydropower Plant. After transformation,the protection configuration is optimized and the protection performance is greatly improved. Besides,the debugging is convenient,the action is reliable,and the maintenance work and the annual maintenance cost are reduced. This provides a favorable guarantee for the reliable operation of the generator-transformer unit equipment in Zipingpu Hydropower Plant,and also gives a reference for the equipment transformation in the future.

关 键 词:发变组保护装置 改造的必要性 改造项目 主要成果 

分 类 号:TM622[电气工程—电力系统及自动化] U224.22[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象