检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:令紫娟[1] 吴满意[2] Ling Zijuan;Wu Manyi(Gansu Industry Polytechnic College,Tianshui 741025,China;The First Topographic Surveying Brigade of SBSM,Xi'an 710054,China)
机构地区:[1]甘肃工业职业技术学院,甘肃天水741025 [2]国家测绘地理信息局第一地形测量队,陕西西安710054
出 处:《矿山测量》2018年第4期54-57,62,共5页Mine Surveying
基 金:国家教育体制改革试点项目(08-128-238);甘肃省教育厅研究生导师项目计划(1121-03;121801)
摘 要:文中通过对基坑变形监测方法的研究,以西安市中贸广场为例,对基坑变形监测实施方案进行设计,确定其基坑变形水平位移监测和沉降监测方法,并结合实际情况确定监测周期。Through the study of the deformation monitoring method of foundation ditch, in the paper, taking Xi'an Zhongmao Square as an example, the implementation scheme of the deformation monitoring of the foundation pit was designed, the horizontal displacement monitoring and the settlement monitoring method of the foundation pit deformation were determined and the monitoring period was determined combining the actual situation.
分 类 号:TD172[矿业工程—矿山地质测量]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.150