乌拉泊水库清淤方案比选分析  被引量:1

Comparison and analysis of silt removal plan in Ulapur Reservoir

在线阅读下载全文

作  者:陈志红 CHEN Zhihong(Hunan Xingyu Construction Co.,Ltd.,Changde 415000,China)

机构地区:[1]湖南兴禹建设有限公司,湖南常德415000

出  处:《水利建设与管理》2018年第8期70-73,共4页Water Conservancy Construction and Management

摘  要:乌拉泊水库淤积情况严重,影响了水库有效库容。本文根据乌拉泊水库的淤积量、淤积型态及分布、淤积物组成和地区气候水文特点,在不影响城市正常供水和防洪条件下,对清淤工程方案和主要设备进行比选分析,并对工期进行优化,可为类似水库清淤工程施工提供借鉴。Ulapur Reservoir has serious siltation,which has affected the effective storage capacity of the reservoir. Silt removal project plan and main equipment are compared and analyzed in the paper according to sedimentation of Ulapur Reservoir, sedimentation type, sedimentation distribution, deposit composition and regional climate hydrology characteristics under the condition of not affecting urban normal water supply and flood control. The construction period is optimized,thereby providing reference for constructing similar reservoir silt removal projects.

关 键 词:水库清淤 方案比选 挖泥船 

分 类 号:TV697.31[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象