检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范进军[1] 何建平[1] 刘奇 谢中建[1] FAN Jin-jun;HE Jian-ping;LIU Qi;XIE Zhong-jian(Jinlong Copper Co.Ltd.,Tongling 244021,Anhui,China)
出 处:《有色金属(冶炼部分)》2018年第8期8-11,共4页Nonferrous Metals(Extractive Metallurgy)
基 金:国家重大科学仪器设备开发专项(2012YQ22011907)
摘 要:转炉吹炼终点判断对整个火法冶炼过程至关重要,过吹、欠吹都会对产品质量、周期控制造成重大影响,前期的终点判断完全由炉长个人经验判断。研究开发一套铜终点在线监测系统,通过对造渣期炉内PbO和PbS强度采集和分析、造铜期内烟气中SO_2浓度采样分析、吹炼过程中熔体温度监测以及吹炼过程仿真预测,帮助炉长判断造渣期及造铜期终点,避免了转炉过吹、欠吹对生产的影响,保证生产安全,提高生产效率,初步实现了铜转炉吹炼过程智能控制。Judgment of converter blowing ending is essential for entire smelting process.Either over blowing or less blowing will have a tremendous influence on product quality and cycle control.Early judgment of end point is entirely performed based on personal experience of the furnace.By analyzing characteristic spectra of PbO and PbS in melt during slagging and SO2 concentration in flue gas of boiler during copper production,monitoring temperature of melt,and forecast by simulation of smelting,copper end point on-line monitoring system is developed to help operator to judge end point of converter blowing,ensure production safety and improve production efficiency.Intelligent control of converting process of copper converter is preliminarily realized.
分 类 号:TF811[冶金工程—有色金属冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3