检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘永朝 魏家强 L;WEI Jia-qiang(State Power Investment Group Co.Ltd.,the Upper Yellow River Hydropower Development Co.Ltd.,Hercynian New EnergyGeneration Department,Haixi 817000,China)
机构地区:[1]国家电力投资集团公司黄河上游水电开发有限责任公司海西新能源发电部,青海海西817000
出 处:《工程建设与设计》2018年第17期95-97,101,共4页Construction & Design for Engineering
摘 要:针对风电机组运行时因发电机温度高导致限功率输出的现象。论文通过对比直驱、双馈机组发电机冷却方式,结合风电机组现场运行实际,就某双馈机组发电机高温降容问题做出对比,通过改造前后发电机轴承温度、机组功率输出数据,验证改造成果的效果,解决发电机高温降容问题,保证风电机组全生命周期管理。In view of the phenomenon of limited power output caused by high generator temperature during the operation of wind power units, this paper compares the cooling modes of generators of direct drive and doubly-fed units,, combined with the actual operation of wind turbine, this paper makes a comparison on the problem of high temperature capacity reduction o fa generator with a doubly-fed unit. Through the beating temperature and power output data of the generator before and after transformation, we can verify the effect of the transformation results, solve the problem of high-temperature capacity reduction of the generator, and ensure the whole life cycle management of the wind turbine.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.189.231