煤矿井下巷道贯通测量技术及其精度控制  被引量:9

Holing Through Measurement Technology in Underground Roadways of the Coal Mine and Its Precision Control

在线阅读下载全文

作  者:贾冬冬 JIA Dongdong(Lvliangshan Coal and Electricity Co.,Ltd.,Huozhou Coal Electricity Group Co.,Ltd.,Fangshan 033199,Shanxi,China)

机构地区:[1]霍州煤电集团吕梁山煤电有限公司,山西方山033199

出  处:《能源与节能》2018年第9期30-32,共3页Energy and Energy Conservation

摘  要:主要介绍山西A煤矿+770 m矿井贯通工程,对贯通工程中的所得数据进行分析,分析造成贯通精度的误差和减低误差的措施,对比分析了煤矿矿井映射校正误差和贯通精度的联系,井下巷道贯通总误差受井下导线测量、立井定向、地表变化等误差干扰,探讨分析能有效控制精度的手段。This paper mainly introduced +770 m holing through project of A coal mine in Shanxi, analyzed the data obtained in holing through project, the errors in it and the measures that reduced errors, and compared and analyzed the connection between error correction by mapping and holing through precision in the coal mine. The total error of holing through in underground tunnel was disturbed by the errors in underground wire measurement, shaft orientation and surface change, etc.. This paper explored and analyzed methods to effectively control the precision.

关 键 词:大型贯通工程 控制网 误差分析 测量精度 

分 类 号:TD175.5[矿业工程—矿山地质测量]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象