检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贾冬冬 JIA Dongdong(Lvliangshan Coal and Electricity Co.,Ltd.,Huozhou Coal Electricity Group Co.,Ltd.,Fangshan 033199,Shanxi,China)
机构地区:[1]霍州煤电集团吕梁山煤电有限公司,山西方山033199
出 处:《能源与节能》2018年第9期30-32,共3页Energy and Energy Conservation
摘 要:主要介绍山西A煤矿+770 m矿井贯通工程,对贯通工程中的所得数据进行分析,分析造成贯通精度的误差和减低误差的措施,对比分析了煤矿矿井映射校正误差和贯通精度的联系,井下巷道贯通总误差受井下导线测量、立井定向、地表变化等误差干扰,探讨分析能有效控制精度的手段。This paper mainly introduced +770 m holing through project of A coal mine in Shanxi, analyzed the data obtained in holing through project, the errors in it and the measures that reduced errors, and compared and analyzed the connection between error correction by mapping and holing through precision in the coal mine. The total error of holing through in underground tunnel was disturbed by the errors in underground wire measurement, shaft orientation and surface change, etc.. This paper explored and analyzed methods to effectively control the precision.
分 类 号:TD175.5[矿业工程—矿山地质测量]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127