磁窑沟煤矿大采高综采技术问题分析及优化对策研究  被引量:2

Study on technical problem and optimization plan of large mining height technology in Ciyaogou Mine

在线阅读下载全文

作  者:张磊 Zhang Lei(Mingye Mine Corporation Ltd.,Shanxi Coal Transportation Group,Xinzhou 036700,China)

机构地区:[1]山西煤炭运销集团明业煤矿有限公司,山西忻州036700

出  处:《煤炭与化工》2018年第8期10-12,共3页Coal and Chemical Industry

摘  要:以山西煤炭运销集团磁窑沟煤矿10202综采工作面大采高一次采全高综采作为研究对象,对10202综采工作面开采过程中出现的工作面片帮、倒架、滚矸等情况进行了全面分析,并从三机配套优化、回采工艺优化、坚硬顶板弱化控制、煤壁安全控制等方面提出了对应的优化控制策略,并取得了较好的现场应用效果。10202 fully mechanized working face one time mining height of Ciyaogou Mine of Shanxi Coal Transportation Group was taken as example,rib spalling,support remove,wasted coal rolling in the working face were analyzed,the corresponding measures of supporting equipment optimization of the three machines and recovery process,weakening control of hard roof and safety control of coal wall were given,with good application effect.

关 键 词:大采高 综采技术 问题分析 优化对策 

分 类 号:TD823.97[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象