基建新站中远动信号验收用时的探讨  被引量:2

Discussion on Acceptance Time of Tele-control Signal in New Built Station

在线阅读下载全文

作  者:王伟光 WANG Weiguang(Guangzhou Power Supply Bureau Co.,Ltd.,Guangzhou 510000,China)

机构地区:[1]广州供电局有限公司,广州510000

出  处:《电工技术》2018年第18期98-100,106,共4页Electric Engineering

摘  要:本文通过分析新建变电站自动化远动三遥验收的内容和方法,建立一个量化的信号验收时间模型,进而推导出三遥数据量的验收时间,为基建新站合理安排工程进度,明确调度数据通讯连接、质监验收、变电站启动等关键节点时间提供依据。The content and method of acceptance of automatic remote signaling 3 in new built station were analyzed. A quantitative signal acceptance time model was established. Then, the acceptance time of three remote data was deduced. The reference of clear scheduling data communication links, quality supervision acceptance, substation start-up and other key node time were provided for reasonable arrangement of project progress of new station f construction.

关 键 词:远动 遥信 遥测 遥控 验收用时 

分 类 号:TM63[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象