作 者:谭剑波[1,2] 何自立[2] 王立青[2] TAN Jianbo;HE Zili;WANG Liqing(Yangling Vocational and Technical College,Yangling 712100,China;College of Water Resources and Architecture Engineering,Northwest A & F University,Yangling 712100,China)
机构地区:[1]杨凌职业技术学院,陕西杨凌712100 [2]西北农林科技大学水利与建筑工程学院,陕西杨凌712100
出 处:《水资源与水工程学报》2018年第3期164-168,174,共6页Journal of Water Resources and Water Engineering
基 金:国家科技支撑计划项目(2012BAD10B02);陕西省水利科技项目(SLKJ-2013-14)
摘 要:为准确掌握白云峡水电站增效扩容潜力,确保技改方案具有较高安全可靠性和节能经济性,采用参证站径流资料分析与发电量反算引用流量相互验证的设计思路,对电站扩容潜力进行了水能复核。考虑"引红济石"调水流量和小水电技改技术要求,合理确定了与工程实际相匹配的最佳装机容量、方案和机组型号。研究表明:通过鹦鸽水文站径流资料及电站多年运行发电量统计数据的核算与反算,可获得反映电站水能指标的准确数据。进行机型优化比选与合理技术改造,可确保机组长期运行在高效工况区,增加出力和防止空蚀,在增效扩容的同时实现了节能降耗。In order to accurately master the efficiency-improving and capacity-expanding potential of Baiyunxia hydropower station,and ensure that the technical transformation scheme has high safety,reliability,and economics of energy saving,based on the design ideas of mutual verification between analyzing the runoff data of reference station and back-calculation of the power generation,the hydropowerchecking of the power station for mining the potential expansion has been done. The optimal installed capacity,scheme and turbine type of Baiyunxia hydropower station have been confirmed after considering the water flow of " Hongyanhe-to-Shitouhe Water Transfer Project" and reformed technical requirement of small hydropower. The research results show that through the calculation and back-calculation of Yingge station runoff data in Shanchahe and statistical data of years of running power generation,the accurate data of water energy index which can reflect the operation characteristic of power station has been obtained.And the optimizing selection and reasonable technological reform of the hydro-turbine can ensure the generator unit long-term operating in high efficiency operating area. After feasible technical reform the design objective of increasing the output and preventing the cavitations has been achieved,the power station can realize the aims of energy conservation and consumption reduction at the same time of efficiency-improving and capacity-expanding.
关 键 词:农村小水电 水能复核 发电量 年利用小时数 装机容量 机组选型