检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘勇[1] LIU Yong(Department of architectural engineering,huaibei vocational and technical college,huaibei anhui 23500)
机构地区:[1]淮北职业技术学院建筑工程系,安徽淮北235000
出 处:《招标与投标》2018年第9期51-53,共3页Tendering and Bidding
基 金:安徽省高等学校教学质量工程名师(大师)工作室项目:刘勇名师工作室(2016msgzs065)
摘 要:招标代理服务费、工程量清单和控制价编制费应本着"谁委托谁支付"的原则确定支付主体。在建设工程招投标实践中,由于对发改办价格[2003]857号等规定理解的偏差等原因,招标人通过招标文件规定由中标人支付,这不仅损害了中标企业的合法权益,也给财务管理带来麻烦,建议对不合规的做法予以纠正。Bidding agent service fee bill of quantities and control price establishment fee should be based on the principle of who entrusted payment sure pay main body In the practice of the construction project bidding, as the price for the office [2003] no. 857 and other laws and regulations to understand the reason of deviation, the tenderer stipulated by the winning bidder to pay by the tender documents, not only damage the legitimate rights and interests of the bid-winning enterprises and also bring financial management problems, Suggestions of irregularities has been corrected.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.100.166