检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭涛[1]
出 处:《大坝与安全》2002年第4期29-31,35,共4页Dam & Safety
摘 要:十三陵蓄能电站上水库为国内首座采用钢筋混凝土面板全库防渗的上水库,工程地形地质条件复杂,防渗面积大,监测仪器种类多、数量大,运行工况同常规水电站有较大的差别。针对上述实际情况,本文全面介绍该电厂上水库的安全监测系统概况及其自动化改造。The upper pool in Shisanling Pumped Storage Station is the first one at which the reinforced concrete proof facing is adopted.In this project,its engineeering topographic and geological condition is quite complicated in upper pool,a variety of monitoring apparatus were installed,the operation condition is much different from conventional hydropower station.In this paper,the automation modifica-tion scheme and the summary of monitoring system have been introduced.
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222