检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:齐毅男 李翰翀 管庆松 张显达[2] 李海兵[2] 彭林 QI Yi-nan;LI Han-chongL;GUAN Qing-song;ZHANG Xian-da;LI Hai-bing;PENG Lin(Yunnan Quakesafe Seismic Isolation Technologies Co.,Ltd.,650217,Yunnan,China;Beijing Urban Construction Group Co.,Ltd.,100081,Beijing,China)
机构地区:[1]云南震安减震科技股份有限公司,昆明650217 [2]北京城建集团有限责任公司,北京100081
出 处:《建筑技术》2018年第9期962-965,共4页Architecture Technology
基 金:北京市科技计划课题(Z161100005116009)
摘 要:北京新机场航站楼是全球最大的单体隔震建筑,针对隔震施工时场地运输条件差、支座节点构造复杂、支座吊运困难等特点,采取节点构造优化、支墩二次灌浆、保留支座预埋定位板等措施,确保了大直径支座吊装、支座特殊节点连接、大截面支墩的密实度及平整度,工程质量良好。Beijing new airport terminal building is the largest building using isolation technology of the world, the isolation bearings and dampers are used to reduce seismic effect and vibration caused by the subway. Considering the incompleted transportation, complex isolation connection, hoisting difficulties and so on. Some measures such as the tower crane co-used with construction equipment, the way of assembling reinforcement optimized, secondary grouting enforced, locating plate retained, are taken to ensure the large diameter isolation bearing hoisted, isolation bearing special connection completed, the criterion of large section buttresses compactness and smoothness meted. The isolation beating installation method and quality control for installation provide experience for isolation projects using large diameter rubber isolation in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249