基于供热系统热惯性供热机组短时深度参与电网调峰及风电消纳研究  被引量:18

In-depth Grid Power Peak Regulation with Heating Unit in Wind Power Consumption based on Thermal Inertia Characteristics

在线阅读下载全文

作  者:毕庆生[1] 李邓超 朱侃 韩雪 BI Qing-sheng;LI Deng-chao;ZHU Kan;HAN Xue(Dept of Energy and Power Engineering,Changchun Institute of Technology,Jilin Building Energy Supply and Indoor Environment Control Engineering Research Center,Changchun,China,Post Code : 130012;Huaneng(Suzhou Industrial Park)Power Generation Institute,Taicang,China,Post Code: 215400;Northeast Electric Power Design Institute,Changchun,China,Post Code : 130021)

机构地区:[1]长春工程学院能源与动力工程学院吉林省建筑能源供应及室内环境控制工程研究中心,吉林长春130012 [2]华能苏州工业园区发电有限责任公司,江苏太仓215400 [3]东北电力勘测设计院,吉林长春130021

出  处:《热能动力工程》2018年第9期72-78,共7页Journal of Engineering for Thermal Energy and Power

基  金:国家级大创项目(201511437013);吉林省教育厅项目(20158305)~~

摘  要:针对我国供热机组占比高的北方寒冷地区特别是东北地区的电网,在冬季供暖期间存在严重弃风的问题,提出了利用供热系统的蓄热特性,供热机组短时深度参与电网调峰及风电消纳的方法,并建立了供热系统热惯性数学模型和含供热系统热惯性供热机组短时深度参与电网调峰及风电消纳的数学模型。结合案例的详细计算说明了配合电网在用电高峰时段,采取供热机组对建筑物提前蓄热的办法,蓄热时间为6. 44 h,在电网低负荷时,供热机组降适当减少供热量进而减少电负荷,利用建筑物和热网的蓄热量满足供热要求,放热时间为8. 26 h,从而获得更加深度调峰容量空间协助电网度过低谷并消纳风电等可再生能源,具有可行性和可操作性。供热机组按最小抽汽量114. 3 t/h运行时,每台机组可为风电并网增加约162. 96 MW的容量。In view of the problem of severe wind abandonment during the winter heating period in the northern cold regions, especially in the northeast region, where heating units in China are high, the heat storage characteristics of the heating system are proposed, and the heating unit participates in the grid peak power regulation for a short time. The mathematical models are established for thermal inertia of heating system, and mathematical model for wind power. The detailed calculations illustrate that with the heating system used to heat the building in advance during the peak hours of power supply, the heat stor- age time is 6.44 h. When the power grid is under low load, the heating unit reduces the heat supply ap- propriately. In turn, the electric load is reduced, and the heat storage capacity of the building and the heating network is used to meet the heating requirement. The exothermic time is 8.26 h, thereby obtaining a deeper peak shaving capacity space, assisting the power grid to pass the trough and eliminating the re- newable energy such as wind power, indicating feasibility and operability. When the heating unit is opera- ted at a minimum steam extraction rate of 114.3 t/h,each unit can increase the capacity of the wind pow-er grid by about 162.96 MW.

关 键 词:供热机组 供热系统 蓄热特性 电网调峰 风电消纳 

分 类 号:TM715[电气工程—电力系统及自动化] TM73

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象