风险防范项目的大修理资金分配原理与方法  

Principles and Methods of Capital Allocation for Major Repair of Risk Prevention Projects

在线阅读下载全文

作  者:李海涛 LI Haitao(PetroChina International Investment Corporation(Canada),Calgary T2P0W)

机构地区:[1]中石油国际投资加拿大公司

出  处:《上海管理科学》2018年第5期123-125,共3页Shanghai Management Science

摘  要:限下大修理项目的预算分配是规划计划的工作重点和难点,工作繁杂、量大,而且资金预算分配主要依靠主观经验。以构成系统的基本单元为主体,利用差分序列加权法,通过致灾因子量的叠加进行权系数分配,将完全主观因素降到了最低,具有鲜明的理论价值与实际应用价值。The budget allocation of the limited large repair project is the key and difficult point of the project planning.The work is complex and large,and the budget allocation of funds mainly depends on subjective experience.In this paper,in order to minimize the total subjective factors,we constitute the basic unit of system as the main body,using differential sequences weighting method through the superposition of disaster-causing factors weights allocation which have a theoretical and practical application value.

关 键 词:差分序列加权 大修理项目资金预算分配 致灾因子 

分 类 号:C93[经济管理—管理学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象