检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张海强 ZHANG Hai-qiang(Gansu Wan Tai Construction Engineering Co.,Ltd.,Lanzhou Gansu 730000,China)
机构地区:[1]甘肃万泰建设工程有限公司,甘肃兰州730000
出 处:《科技视界》2018年第23期232-233,共2页Science & Technology Vision
摘 要:本文结合公路施工项目三级配电设备选型及采购现状,对项目临时用电工作中三级配电设备选型的重要性和意义进行了阐述,规范了三级配电设备选型工作流程,形成了一套标准,适用的工作方法,有力的保障了项目临时用电工作顺利推进和实施,具有实践指导意义。Combining with the present situation of type selection and purchasing of three -level distribution equipment in highway construction project,this paper expounds the importance and significance of type selection of three- level distribution equipment in temporary power consumption of the project,standardizes the working process of type selection of three-level distribution equipment,forms a set guarantees the imminence of the project. It is of practical standards and applicable working methods,and effectively significance to promote and implement electricity utilization smoothly.
分 类 号:TU731[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49