检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐明鸣 徐志鸿 何洪波 李林 XYU Ming-ming, XYU Zhi -hong, HE Hong-bo, LI Lin(Hunan Electric Power Design Institute, Changsha 410007, China)
机构地区:[1]中国能源建设集团湖南省电力设计院有限公司,湖南长沙410007
出 处:《电力勘测设计》2018年第A02期160-163,共4页Electric Power Survey & Design
摘 要:根据目前城区输电线路设计情况,按塔头挂线布置型式提出了线路走廊宽度的对比及窄基钢管塔的适用性,按城市的不同地段且考虑是否跨房拆房等情况,分析了四回路角钢塔、四回路钢管杆及六层布置的窄基钢管塔的经济性。According to the current design of urban transmission line, the contrast of layout type of transmission line was proposed for transmission line corridor width and the applicability of narrow base steel tube tower was analyzed. The economy of four-circuit angle steel tower, four-circuit steel tube tower and six-layer narrow steel tube tower was compared by consideration of diferent sections of the city and the situation of room demolition.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.79