检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵刚 ZHAO Gang(China Nonferrous Metal Mining(Group)Fushun Hongtoushan Co.,Ltd.,Fushun 113321,China)
机构地区:[1]中国有色集团抚顺红透山矿业有限公司,辽宁抚顺113321
出 处:《有色矿冶》2018年第5期58-62,共5页Non-Ferrous Mining and Metallurgy
摘 要:矿业开发项目涉及面广,需要各方面的知识和技能,所以在判断一个项目时,一定要多学习、多思考、多请教、多调查。近年来随着矿业投资规模与频次的增加,矿业开发地质工作任务繁重,风险性增高,特别体现在矿山地质综合分析方面。本文基于矿业开发工作中的特殊性和当前市场热度,总结矿产资源开发的地质风险,从依法办矿、矿权价款、矿权选择、地质评价、定位找矿等方面作了分析,以提高矿业开发项目的地质判断能力,最大限度的降低地质风险。Mining development projects involve a wide range of knowledge and skills in all aspects, so when judging a project, we must learn more, think more, consult more, and investigate more. In recent years, with the increase in the scale and frequency of mining investment, the geological task of mining development is heavy and the risk is increasing, especially in the comprehensive analysis of mine geology. Based on the particularity of the mining de velopment and the current market heat, this paper summarizes the geological risk of mineral resources develop ment, and analyses it ftom the aspects of running mine, mineral rights price, mineral right selection, geological e valuation, and positioning and prospecting, in order to improve the geological judgement energy of the mining de velopment project and reduce the geological risk to the maximum limit.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249