检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐际宇[1] 林忠和[1] 梁月利 王翔 TANG Jiyu;LIN Zhonghe;LIANG Yueli;WANG Xiang(Guangxi Branch of China Construction Eighth Engineering Division Co.,Ltd.,Nanning,Gmlnt,xi 530028,Chin~)
机构地区:[1]中国建筑第八工程局有限公司广西分公司,广西南宁530028
出 处:《施工技术》2018年第18期23-27,共5页Construction Technology
基 金:中建八局科技资助项目(2016-42)
摘 要:南宁华润中心东写字楼项目采用内顶外爬模架系统,该模架系统适应性强,对于本工程中核心筒的多次变化,模架系统可以方便拆改。完成顶升任务时,对该模架系统拆除前需综合考虑拆除的各项前置条件,充分做好拆除准备,明确拆除流程,详细阐述内顶外爬模架系统的拆除施工技术。Scaffold system with inner top climbing is used in East Office Building engineering of Nanning Huarun Center,there is strong adaptability for the scaffold system,it is easy for demolition of scaffold system based on multiple changes of core tube.The pre-condition of demolition is considered before demolition of scaffold system in lift-up construction,demolition preparation work is done,demolition process is definite. This paper introduces the demolition construction of scaffold system with inner top climbing.
分 类 号:TU974[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.8