迁江华侨工业园防洪排涝一期工程设计  被引量:3

Design of 1st-stage flood control and drainage project in Qianjiang Returned Overseas Chinese Industrial Park

在线阅读下载全文

作  者:蒙世仟[1] MENG Shi-qian(Guangxi Water and Power Design Institute,Nanning 530023,China)

机构地区:[1]广西水利电力勘测设计研究院,南宁530023

出  处:《广西水利水电》2018年第5期10-13,共4页Guangxi Water Resources & Hydropower Engineering

摘  要:来宾市迁江华侨工业园防洪排涝一期工程由防洪工程、排涝工程和交通工程等组成,防护对象主要为电解铝厂及其配套项目。工程总体布置特点为围绕电解铝厂区呈不连续环状分布。论述了工业园防洪排涝工程的设计标准及防洪工程布置、帷幕灌浆布置、排涝工程设计和交通工程布置。The lst-stage flood control and drainage project in Qianjiang Returned Overseas Chinese Industrial Park consists of flood control works, drainage works and traffic engineering. The major protected target is the aluminum electrolysis plant and its auxiliary facilities, so this project discontinuously surrounds the plant area. The author discussed the design standard, layout of flood control works, arrangement of curtain grouting, design of drainage works and layout of traffic engineering.

关 键 词:防洪工程 排涝工程 帷幕灌浆 设计标准 迁江华侨工业园 

分 类 号:TV871[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象