检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:向旻[1] 尚彦军[1] 曹远远 孟和 安然[1] XIANG Min;SHANG Yan-jun;CAO Yuan-yuan;MENG He;AN Ran(Department of Mining Engineering,Xinjiang Institute of Engineering,Urumqi 830001,China)
机构地区:[1]新疆工程学院采矿工程系,乌鲁木齐830001
出 处:《煤炭技术》2018年第10期243-245,共3页Coal Technology
基 金:新疆维吾尔自治区高校科研计划项目(XJEDU2017S056)
摘 要:以新疆呼图壁县丰源煤矿为例,在分析矿区地质条件、水文地质条件的基础上,利用高密度电阻率法确定了主井导水通道位置。结论表明,在确定导水通道,以预防煤矿涌水这一工作中,所采用的结合地质调查、水文地质调查以及地球物理勘探的方法具有非常理想的适用性。Studies the problem of Fengyuan coal mine in Hutubi of Xinjiang.On the basis of analyzing geological conditions and hydrogeological conditions near this mining,the location of water flow channel in the main shaft is determined by high density resistivity method.The conclusion shows that it has a very ideal applicability to combine geological survey,hydrogeological survey and geophysical exploration in determining water flow channel to prevent water gushing in a coal mine.
分 类 号:TD742[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227