水轮发电机升流试验三相短路点设置浅析  

Brief Analysis of Three-Phase Short-Circuit Point Setting for Hydrogenerator Current Boosting Test

在线阅读下载全文

作  者:谭军 李萍 TAN Jun;LI Ping(China Energy Engineering Group Guangxi Electric Power Design Institute Co.,Ltd.,Nanning,Guangxi,53000)

机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007

出  处:《红水河》2018年第5期17-19,共3页Hongshui River

摘  要:为了研究水轮发电机升流试验三相电路点的设置位置,以便在设计阶段就综合考虑完善,以利于后期的现场试验。根据发电机出口断路器及主引出线的不同形式,研究了发电机出口三相短路点设置的几种情况。得出结论:在进行电气主接线设计时,应根据不同的接线形式,考虑好三相短路点的设置,在三相短路点与发电机之间布置一组测量电流互感器,以免试验时要另外增加,引起试验的不便。三相短路点的位置应设置在现场便于安装的地方。The study of the setting position of three-phase circuit points for hydrogenerator current boosting test, so as to improve and consider comprehensively in the design stage, benefits the later field test. According to the different types of generator circuit breaker and main lead line, this paper studies several cases of three-phase short-circuit points setting of generator outlet. It is concluded that a set of measuring current transformers is arranged between the three-phase short-circuit point and the generator according to different wiring forms and the setting of three-phase short-circuit points in the design of the main electrical connection scheme, so as to avoid additional increase in the test and cause inconvenience in the test. The location of three-phase short-circuit points should be at a site where it is easy to install.

关 键 词:发电机出口 主引出线 升流试验 短路点 

分 类 号:TM312.06[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象