青岛港某自动化集装箱堆场地基处理设计研究  被引量:1

Research on Foundation Treatment Design of One Automated Container Yard in Qingdao Port

在线阅读下载全文

作  者:范莹莹[1] 远航 陈思周[1] Fan Yingying;Yuan Hang;Chen Sizhou(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China;Construction Branch of Qingdao Port International Co.,Ltd.,Qingdao Shandong 266000,China)

机构地区:[1]中交第一航务工程勘察设计院有限公司,天津300222 [2]青岛港国际股份有限公司港建分公司,山东青岛266000

出  处:《港工技术》2018年第5期104-107,共4页Port Engineering Technology

摘  要:本工程前期按常规集装箱堆场设计,不同陆域形成区域采用相应的软基地基处理方案并已完成部分施工。后期针对自动化集装箱堆场升级要求并结合前期地基处理效果,提出多种地基补强处理方案,力求达到进一步消除地基残留沉降,满足自动化集装箱堆场使用要求的目的。A conventional container yard was designed in early stage of the project, different soft foundation treatment plans applied to the corresponding areas and part of construction was completed. In view of the upgrading requirements for automated container yard in later stage of the project, the effect of early-stage foundation treatment was studied and a variety of foundation reinforcing plans were proposed in order to further eliminate the residual settlement and meet the use requirements.

关 键 词:陆域形成 地基处理 补强 自动化 集装箱堆场 码头 港口工程 

分 类 号:U656.135[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象