检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王云广[1,2] 郭文兵 白二虎[1] 张子月 康育鹏 柴华彬 陈俊杰 WANG Yunguang;GUO Wenbing;BAI Erhu;ZHANG Ziyue;KANG Yupeng;CHAI Huabin;CHEN Junjine(School of Energy Science and Engineering,Henan Polytechnic University,Jiaozuo 454000,China;Collaborative Innovative Center of Coal Safety Pro-duction in ttenan Province,Jiaozuo 454000,China;School of Geography Science and Tourism Management,Nanyang Norrmd University,Nanyang 473061,China;School of Surveying and Land Information Engineering,Henan Polytechnic University,Jiaozuo 454000,China;Planning and Construction Headquarters of Tonghu Ecological Smart Zone,Huizhou 516000,China)
机构地区:[1]河南理工大学能源科学与工程学院,河南焦作454000 [2]潼湖生态智慧区规划建设指挥部,广东惠州516000 [3]煤炭安全生产河南省协同创新中心,河南焦作454000 [4]南阳师范学院环境科学与旅游学院,河南南阳473061 [5]河南理工大学测绘与国土信息工程学院,河南焦作454000
出 处:《煤炭学报》2018年第B06期28-35,共8页Journal of China Coal Society
基 金:国家自然科学基金资助项目(51774111;51374092)
摘 要:随着我国煤炭开采重心的西移,高强度开采已在西部省区大规模开展并将持续进行。通过研究亿吨级煤炭基地分布、服务定位、开采规模、地质条件及典型高强度开采煤矿覆岩运移观测数据,论述了高强度开采覆岩的破坏变形特征及其区域环境影响,给出了高强度开采覆岩"两带"高度计算公式。基于高强度开采工作面覆岩短时间产生剧烈破坏、非连续变形明显、不产生"蠕变"等基本特征,结合相似模拟及理论力学分析,系统论述了高强度开采覆岩的运移过程,提出了三维立体空间条件下的高强度开采覆岩运移的"弹性薄板"+"平行压力拱"复合机理模型,该机理模型合理揭示了高强度开采覆岩的运移过程和机理。With China's coal mining center shifts westward,a high-intensity mining has been carried out in the China's western provinces and municipalities on a large scale and the trend will continue.The failure characteristics of ground movement and deformation,overlying strata and environmental impact were discussed,and the calculation formula of caving zone height and the height of water flowing fractured zone( "Two-zone"height) were given,based on the analysis on the distribution of coal bases,target location,annual output,geological conditions of coal and measured data from typical high-intensity mining coal mine.Based on the severe failure of overlying strata after mining,a large number of discontinuous deformations and no creep,the combination mechanism model "elastic thin plate"plus "parallel stress arch"that studying the failure of overlying strata was put forward.According to simulation and theoretical mechanics analysis,and the model was in line with the process and mechanism due to high-intensity coal mining face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15