新大地煤业副斜井提升设备改造设计  被引量:2

Reconstructing Design of Xindadi Coal Industry Sub-inclined Well Elevation Equipment

在线阅读下载全文

作  者:裴常灵 赵雅风 Pei Changling;Zhao Yafeng(Shanxi Guochen Construction Engineering Design Co.,Ltd.,Yangquan 045000,China)

机构地区:[1]山西国辰建设工程勘察设计有限公司,山西阳泉045000

出  处:《煤矿机械》2018年第10期119-121,共3页Coal Mine Machinery

摘  要:新大地煤业副斜井目前安装有JK-2.5/30X型单滚筒缠绕式提升机1台,提升机最大提升能力不能满足最大件(一次采全高开采设备)提升要求,滚筒与钢丝绳直径之比不满足《煤矿安全规程》要求,提升机液压制动系统没有并联冗余的回油通路。经研究在现有提升机房东侧新建一座提升机房,为矿井提升提供安全、高效、可靠的辅助提升系统。A JK-2.5/30 X single drum winding hoist is currently installed in the sub-inclined well of Xindadi coal industry. The maximum lifting capacity of the existing hoist isn't satisfied with the requirements for the lifting of the largest one(full high mining equipment),the ratio of the drum to the diameter of the steel wire ropes aren't satisfied with the requirements of the Coal Mine Safety Regulations and the hydraulic braking system of the hoist does not have parallel redundancy. Oil return path. After the study,it was decided to build a new upgrade room on the east side of the existing upgrade room. Provide safe, efficient and reliable auxiliary lifting system for mine lifting.

关 键 词:新大地煤业 提升机 钢丝绳 电动机 变位质量 

分 类 号:TD534[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象