检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄俊[1] 杨超 Huang Jtm;Yang Chao
机构地区:[1]杭州市交通工程质量安全监督局,杭州310014 [2]四川理工学院土木工程学院,四川自贡643000
出 处:《建筑技术开发》2018年第18期29-30,共2页Building Technology Development
基 金:浙江省交通运输厅科技计划项目(2016014)
摘 要:依托杭州市砚岭隧道扩挖施工,通过数值计算和现场实测,研究隧道围岩松动圈对扩挖施工中既有衬砌结构的力学影响。数值模拟结果与现场实测数据进行对比分析表明,相较未考虑松动圈,考虑松动圈后的衬砌结构应力特征变化明显,且数值计算结果与现场实测结果更加吻合。Relying on the expansion and excavation construction of Yuling Tunnel in Hangzhou City, the numerical analysis and field measurement were carried out to study the mechanical influence of loose rock surrounding tunnel on the existing lining structure during the excavation and construction. The comparison between the numerical simulation results and the field measurement data shows that the stress characteristics of the lining structure after loosening ring change significantly compared with the loose ring, and the numerical calculation results are more consistent with the field measurement results.
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145