透水理论在南湃水电站高压引水隧洞中的应用  

Application of Permeability Theory in High-pressure Headrace Tunnel of Nam Phay Hydropower Station

在线阅读下载全文

作  者:许战军 康晓娟 XU Zhanjun;KANG Xiaojuan(Powerchina Northwest Engineering Corporation Limited,Xi'an 710065,China)

机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065

出  处:《西北水电》2018年第5期45-46,51,共3页Northwest Hydropower

摘  要:隧洞衬砌中将衬砌混凝土作为透水结构在工程中已经得到应用。南湃水电站引水隧洞采用该方法进行永久支护设计,特别是该水电站高压段围岩以Ⅲ类为主的情况下采用该方法为工程节约了工期和投资,取得较好的经济效益。目前该隧洞已经充水运行,状态良好。In tunnel lining, the lining concrete as the permeable structure is applied in projects. This method is applied in Nam Phay Hydropower Project for design of the permanent support, shortening construction period, reducing investment and achieving better benefit as the surrounding rock at high-pressure section of the headrace tunnel of the Project is Class Ⅲ. Nowadays, the headrace tunnel operates with water charged and is in good status.

关 键 词:高压隧洞 透水理论 三大准则 南湃水电站 

分 类 号:TV732.3[水利工程—水利水电工程] TV314

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象