地下对接技术在长距离曲线顶管隧道中的应用  被引量:3

The Application of Underground Docking Technology for a Long Distance Curving Pipe Jacking Cable Tunnel

在线阅读下载全文

作  者:杨金虎 翟伟 胡文博 毕巧莹 YANG Jin-hu;ZHAI Wei;HU Wen-bo;BI Qiao-ying(Power China Hubei Electric Engineering Corporation Limited,Wuhan 430040,China)

机构地区:[1]湖北省电力勘测设计院有限公司,湖北武汉430040

出  处:《电力勘测设计》2018年第10期71-74,共4页Electric Power Survey & Design

摘  要:顶管对接技术通过对长距离曲线顶管进行分段施工,保证顶管隧道顺利贯通,同时有效减少顶管接收井对场地的占用。文章以武汉某电缆隧道工程中对顶管对接技术的应用为例,分析了顶管对接技术的特点及相关技术措施。For a long distance curving pipe jacking, underground docking technology make the construction of jacking pipe with two push benches and docking underground. It ensure a long distance curving pipe smooth construction, and also reduce site occupation according works without receive well. This paper analyzed the characteristics of pipe jacking underground docking technology and analyzed the construction technical measures based on a cable tunnel project in Wuhan.

关 键 词:顶管对接 长距离曲线顶管 电缆隧道 

分 类 号:TM75[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象