黄万铁路大跨度顶进框构桥施工技术  被引量:2

Construction Technology of Large Span Jacking Framed Bridge on Huang Wan Railway

在线阅读下载全文

作  者:王秋会 刘建明 

机构地区:[1]中铁一局集团技术研发中心土木研究所,陕西西安710054 [2]北京中铁诚业工程建设监理有限公司,北京100000

出  处:《内蒙古公路与运输》2018年第5期32-35,共4页Highways & Transportation in Inner Mongolia

摘  要:在既有运营线下顶推施工是一种常见的施工形式,对于桥幅宽、重量大的大跨度框构桥,顶推施工的难度大、施工技术要求高。文章以黄万铁路大跨度顶进框构桥施工为背景,详细论述了该桥成功顶推的各环节施工措施,包括既有线路加固、路基注浆加固技术、预制基坑滑板的施工细节、油顶选配最大顶力计算及顶进纠偏等措施,这些施工经验可为同类工程提供参考。The construction technique of incremental launching method under existing operation lines is an ordinary form of construction. Because the large span frame bridge is wide and heavy,the construction is more difficult and the construction requirements are higher. Taking the construction of the long-span launching frame bridge on Huang Wan railway as the background,this paper discusses in detail the construction measures for every step of the bridge jacking. Including the reinforcement of existing lines,reinforcement technology of roadbed grouting, construction details of prefabricated foundation pit skateboards, calculation of the maximum jacking force of top oil options, and measures for jacking correction,etc. These construction experiences can provide reference for similar projects.

关 键 词:顶推法施工 注浆加固 基坑滑板 最大顶力 纠偏措施 

分 类 号:U445.46[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象