检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭昌 GUO Chang,(Anhui Survey and Design Institute of Water Conservancy and Hydropower, Hefei 230088, China)
机构地区:[1]安徽省水利水电勘测设计院,安徽合肥230088
出 处:《现代建筑电气》2018年第9期53-55,共3页Modern Architecture Electric
摘 要:针对大型城市排涝泵站的特点,以陈郢排涝泵站电气设计为例,对电气主接线方案的技术性和经济性进行了分析比较,结合运行实践,对主接线形式进行定性分析,提出了优化城市排涝泵站电气设计的方法策略。According to the characteristics of the large urban drainage pumping station,taking the electric design of Chenying drainage pumping station as an example,the technical and economic analysis of the main wiring scheme were compared,and the main connection form was qualitatively analyzed in combination with the operation practice. A strategy for optimizing the electrical design of urban drainage pumping stations was proposed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222