船舶主机整机吊装的工艺与实践  被引量:1

Practice on the Whole Hoisting Process of Marine Main Engine

在线阅读下载全文

作  者:刘凯[1] LIU Kai(Bohai Shipbuilding Vocational College, Huludao 125105, China)

机构地区:[1]渤海船舶职业学院,辽宁葫芦岛125105

出  处:《武汉船舶职业技术学院学报》2018年第3期29-32,共4页Journal of Wuhan Institute of Shipbuilding Technology

摘  要:本文通过对现有造船工艺中主机整体吊装施工作业进行研究,从技术准备、作业准备、作业操作、安全管理等几方面分析和总结了船舶主机整体吊装流程、管理模式及注意事项,对主机整机吊装的施工管理及工艺流程进行了规范,缩短了主机在船上的安装周期,提高造船效率和产品质量,适用于船舶主机特别是大型低速柴油机在船坞或船台的安装。This paper analyzes and summarizes the whole hoisting process,management mode and matters needing attention of main engine in shipbuilding from technical preparation,operation preparation,operation and safety management.The construction management and technological process of the hoisting of the main engine are standardized,which can shorten the installation period of the main engine on board,improve the efficiency of shipbuilding and the quality of products.It is suitable for the installation of the main engine,especially the large low-speed diesel engine,in the dock or berth.

关 键 词:船舶主机 整机吊装 工艺 

分 类 号:U671.4[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象